4.8 KiB
Native CRUD integration and review follow-up
The shared native Add transport uses the proven private-desktop UIA executor, bounded field readback and exact native success message. It closes/reopens the library before comparing exact catalog name/partition and raw engineering identity. Native registration with different engineering bytes returns success=True, identity_matches=False; missing registration is a native failure. Production Add and Update remain disabled pending independent engineering identity proof.
The review of 07a9c1e identified that route readiness alone did not authorize existing-library mutation. The follow-up makes public add() refuse before reading a source or launching a worker. Research callers must use add_owned_fixture(..., probe_token=...) against the fixed library created by the diagnostic workflow and matching probe-owner record. It requires the calling thread's live library lease, checks its lease ID against the checkpoint, owns the management mutex during submission, creates a fresh staged source copy and verified library snapshot, and binds the transaction nonce to target, name, partition, source identity and manifests.
Before native activation the worker revalidates that evidence, exact current lease and live supervisor. It duplicates the supervisor's still-open exclusive sidecar handle and checks its final path, so JSON metadata alone cannot establish ownership. Source alignment is confined to the newly copied worker source. Existing probe CreateLibrary/readd guards remain intact. Removal success matching again excludes both carriage returns and newlines.
Verification is mocked/file-only: the original focused suite passed 86 tests plus two close/reopen checks. Follow-up tests reject public bypass, unprepared activation, missing current-thread ownership, invalid nonce/token/lease, substituted original source, changed backup and expired supervisor, and exercise a valid leased fixture with unchanged original source bytes. No Mentor processes, builds or full suite were launched by this implementation agent; serialized native evidence and semantic-identity research remain coordinator-owned.
The follow-up focused suite passed 99 tests. After restoring ordinary catalog queries for non-DxDesigner flow readback, the native boundary/field subset passed 47 tests (including four additional flow cases). git diff --check passed. The original ignored scratch report remains on disk but is removed from version control.
A second review found ownership lifetime and reverse containment gaps. The fixture route now nests the already-proven caller lease around worker dispatch and retains that same exclusive handle/checkpoint on unsafe return or exception, including callers that supply no release callback. It also rejects a fixture nested anywhere inside the original source tree before staging. Three new failure cases were observed before the fix; the final native-boundary/field subset passed 51 tests, including normal release and uploader-handle denial after uncertain release. No native processes were launched.
The subsequent mentor795-native-content-v1 contract requires pinned native hierarchy/flat ASCII, CSV/property tables and schematic EDIF exports on disposable copies, plus exact raw physical/primary assets. Only the three observed ASCII metadata headers, CSV System_Date field and root EDIF status/written/timestamp node are normalized. All project library references must resolve to an approved library before their values can be normalized. Unknown primary files, layout data, drawing coordinates, properties and EDIF userData remain part of the comparison. Unsupported exports fail closed; this is not a claim of arbitrary unexported CES equivalence.
The real management engine now captures a source baseline before any removal. Native Add requires a prepared transaction binding the verified full backup, staged source, baseline proof, exact target/name/partition, supervisor and exclusive lease. After normal native release, it corrects imported PRJ/PCB library references using the existing documented text helpers, reopens the exact native catalog and compares a target-only identity. Update remains remove plus Add; failures retain the recovery snapshot and checkpoint. The UI action is explicitly labeled “用工程替换已选 CBB…(原生重新导入)”; backup Work restoration is unchanged.
Coordinator-native source/registered capture matched all three exports and primary assets after correcting the observed imported PCB reference; original source manifests were unchanged. Implementation verification remains file-only: 114 focused tests passed before the final bootstrap/lease refinement. create_owned_fixture and run_owned_fixture_management provide a token-bound empty-library/real-engine route for the coordinator's actual CRUD cycle. Production Add/Update remain disabled until that separate acceptance and promotion step.