docs: record published review chain and completed verification
This commit is contained in:
1 parent
173dee1980
commit
dc536da555
1 file changed
+12
-4
@@ -39,10 +39,18 @@ Files: `pyproject.toml`, `README.md`, `SOP.md`, `docs/ICDB-MANUAL-REPAIR-AND-UPD
|
||||
- [x] Inventory final files against main and assign each file to the smallest dependency-closed review stage. Keep UI/release hooks unavailable until their backend exists; do not publish branches with broken normal operation.
|
||||
- [x] Create ordered branches with one concrete feature commit per review unit, no rewriting the existing umbrella history.
|
||||
- [x] Test each review stage using appropriate unit/full checks; preserve all final regressions and verify the final source tree against the umbrella snapshot.
|
||||
- [ ] Push branches without force and create draft PRs with explicit base dependencies. Link them from #3 and record the splitting rationale.
|
||||
- [x] Push branches without force and create draft PRs with explicit base dependencies. Link them from #3 and record the splitting rationale.
|
||||
|
||||
## Task 4: Delivery
|
||||
|
||||
- [ ] Commit and push the safety fixes and validation record to #3.
|
||||
- [ ] Verify remote heads, PR descriptions and clean review worktrees. Keep #3 and issues open and do not merge #5.
|
||||
- [ ] Report PR links, passing tests and remaining field-acceptance limits to the user.
|
||||
- [x] Commit and push the safety fixes and validation record to #3.
|
||||
- [x] Verify remote heads, PR descriptions and clean review worktrees. Keep #3 and issues open and do not merge #5.
|
||||
- [x] Prepare the final user report with PR links, passing tests and remaining field-acceptance limits.
|
||||
|
||||
## Delivery evidence
|
||||
|
||||
- Review chain: [#9](https://git.simgreek.com/Skyworth_Digital_Hardware/cbb-refresh-verify-795/pulls/9) → [#10](https://git.simgreek.com/Skyworth_Digital_Hardware/cbb-refresh-verify-795/pulls/10) → [#11](https://git.simgreek.com/Skyworth_Digital_Hardware/cbb-refresh-verify-795/pulls/11) → [#12](https://git.simgreek.com/Skyworth_Digital_Hardware/cbb-refresh-verify-795/pulls/12). Each base/head was read back from the API and matched local branches; all remain Draft and open.
|
||||
- #3 is the unmerged umbrella with the review chain linked. #5 was not merged; issues #2/#4 remain open.
|
||||
- Complete suites: 491 / 1,376 / 1,545 / 1,601 passed for the four review stages; umbrella 1,601; focused release tests 43. Validation hashes and limits: `docs/releases/2026-11-05-pr249-review-validation.json`.
|
||||
- Final implementation files match byte for byte; compile and diff checks pass. Only review worktrees were committed; the original running r10 test workspace was preserved.
|
||||
- No new frozen package or field ICDB recovery acceptance is claimed. No actual Mentor client/server termination or production-library operation was performed.
|
||||
Reference in new issue
Block a user